Saturday, October 26, 2013

Week 7: Challenges


Challenges that our team is going to face in the coming week will be creating a model of our dynamic pulley-string-generator system and then solving it to find the optimum values that would maximize efficiency. Setting up an optimizer in Excel will also require a strong set of analytical skills, since nobody on the team has much experience with optimization tools. With Gate Review 3 over our shoulders, staying on track time-wise is going to be difficult due to the solid effort the team needs to put into the design in the mean-time. Updating the Gantt chart will help gauge how we are managing our time, but that is another task in itself. Selecting a drivetrain that can transmit the power from the pulley in a compact/efficient package is a challenge because we cannot drive the DC motor with a worm gear on the shaft as originally thought, and requires more volume.